All PORs

Family POR Name Replaced former POR Justification document link Start date End date Change protocol
1cm2 Si 14: Baseline_250508_1cm2_Si 12: Baseline_240814_1cm2_Si 1. CsCl route replaces PbCl2 route for inorganics in first step of perovskite: co-evaporated CsCl, PbI2, PbBr2 a. This has shown to have wider process window for stability, especially on the FAI-rich side 2. FAI thickness is now tailored to the measured Pb mol/cm2 from EDXRF from monitor samples in the inorganic run, rather than being a fixed thickness a. This accounts for variability in actual thickness deposited by Bambi to maintain tighter control over perovskite stoichiometry May 8, 2025, 4:18 p.m. 2: Meet with stakeholders and present data: 1. Median efficiency across ≥ 5 samples is ≥ that of reference samples (ref samples should be ≥14% for semi-T, ≥22% for tandems)gm 2. Reproducibility metric: 3 runs minimum, look at PCE 3. Stability data to support the switch - - T90 for new process ≥ that of controls at 70 C MPPT tested for at least 1000 h, on devices from three different runs of the new process (ie can be one perovskite run) - Drop over 500h 85C dark (Pangolin) testing is less than or equal to that of controls, for at least four devices each
SemiT 13: Baseline_250508_semiT 11: Baseline_240814_semiT 1. CsCl route replaces PbCl2 route for inorganics in first step of perovskite: co-evaporated CsCl, PbI2, PbBr2 a. This has shown to have wider process window for stability, especially on the FAI-rich side 2. FAI thickness is now tailored to the measured Pb mol/cm2 from EDXRF from monitor samples in the inorganic run, rather than being a fixed thickness a. This accounts for variability in actual thickness deposited by Bambi to maintain tighter control over perovskite stoichiometry May 8, 2025, 4:15 p.m. 2: Meet with stakeholders and present data: 1. Median efficiency across ≥ 5 samples is ≥ that of reference samples (ref samples should be ≥14% for semi-T, ≥22% for tandems)gm 2. Reproducibility metric: 3 runs minimum, look at PCE 3. Stability data to support the switch - - T90 for new process ≥ that of controls at 70 C MPPT tested for at least 1000 h, on devices from three different runs of the new process (ie can be one perovskite run) - Drop over 500h 85C dark (Pangolin) testing is less than or equal to that of controls, for at least four devices each
SJ R&D Opaque 15: Standard_SJ_R&D_Opaque_250508 1. CsCl route replaces PbCl2 route for inorganics in first step of perovskite: co-evaporated CsCl, PbI2, PbBr2 a. This has shown to have wider process window for stability, especially on the FAI-rich side 2. FAI thickness is now tailored to the measured Pb mol/cm2 from EDXRF from monitor samples in the inorganic run, rather than being a fixed thickness a. This accounts for variability in actual thickness deposited by Bambi to maintain tighter control over perovskite stoichiometry May 8, 2025, 4:32 p.m. 2: Meet with stakeholders and present data: 1. Median efficiency across ≥ 5 samples is ≥ that of reference samples (ref samples should be ≥14% for semi-T, ≥22% for tandems)gm 2. Reproducibility metric: 3 runs minimum, look at PCE 3. Stability data to support the switch - - T90 for new process ≥ that of controls at 70 C MPPT tested for at least 1000 h, on devices from three different runs of the new process (ie can be one perovskite run) - Drop over 500h 85C dark (Pangolin) testing is less than or equal to that of controls, for at least four devices each
1cm2 Si 10: Baseline_030724_1cm2_Si March 7, 2024, 4:09 p.m. Aug. 21, 2024, 10:50 a.m. 2: Meet with stakeholders and present data: 1. Median efficiency across ≥ 5 samples is ≥ that of reference samples (ref samples should be ≥14% for semi-T, ≥22% for tandems)gm 2. Reproducibility metric: 3 runs minimum, look at PCE 3. Stability data to support the switch - - T90 for new process ≥ that of controls at 70 C MPPT tested for at least 1000 h, on devices from three different runs of the new process (ie can be one perovskite run) - Drop over 500h 85C dark (Pangolin) testing is less than or equal to that of controls, for at least four devices each
1cm2 Si 12: Baseline_240814_1cm2_Si 10: Baseline_030724_1cm2_Si Aug. 21, 2024, 10:50 a.m. May 8, 2025, 4:18 p.m. 2: Meet with stakeholders and present data: 1. Median efficiency across ≥ 5 samples is ≥ that of reference samples (ref samples should be ≥14% for semi-T, ≥22% for tandems)gm 2. Reproducibility metric: 3 runs minimum, look at PCE 3. Stability data to support the switch - - T90 for new process ≥ that of controls at 70 C MPPT tested for at least 1000 h, on devices from three different runs of the new process (ie can be one perovskite run) - Drop over 500h 85C dark (Pangolin) testing is less than or equal to that of controls, for at least four devices each
SemiT 9: Baseline_030724_semiT https://docs.google.com/presentation/d/11GyMjfsT3IJ638Q7vaESwvaeeu4vksTwD0QOSvOoTM4/edit#slide=id.g26b05eea215_0_10 March 7, 2024, 3:54 p.m. Aug. 21, 2024, 10:45 a.m. 2: Meet with stakeholders and present data: 1. Median efficiency across ≥ 5 samples is ≥ that of reference samples (ref samples should be ≥14% for semi-T, ≥22% for tandems)gm 2. Reproducibility metric: 3 runs minimum, look at PCE 3. Stability data to support the switch - - T90 for new process ≥ that of controls at 70 C MPPT tested for at least 1000 h, on devices from three different runs of the new process (ie can be one perovskite run) - Drop over 500h 85C dark (Pangolin) testing is less than or equal to that of controls, for at least four devices each
SemiT 11: Baseline_240814_semiT 9: Baseline_030724_semiT https://docs.google.com/presentation/d/11GyMjfsT3IJ638Q7vaESwvaeeu4vksTwD0QOSvOoTM4/edit#slide=id.g22219a3fe32_0_0 Aug. 21, 2024, 10:45 a.m. May 8, 2025, 4:15 p.m. 2: Meet with stakeholders and present data: 1. Median efficiency across ≥ 5 samples is ≥ that of reference samples (ref samples should be ≥14% for semi-T, ≥22% for tandems)gm 2. Reproducibility metric: 3 runs minimum, look at PCE 3. Stability data to support the switch - - T90 for new process ≥ that of controls at 70 C MPPT tested for at least 1000 h, on devices from three different runs of the new process (ie can be one perovskite run) - Drop over 500h 85C dark (Pangolin) testing is less than or equal to that of controls, for at least four devices each
SJ opaque, EDAI, BCP 1: POR: SJ opaque, EDAI, BCP 230829 - 231116 Initial backfill of PORs Aug. 29, 2023, midnight Nov. 16, 2023, 5:33 p.m. 1: Rohit and Jochen make the decision based on “sufficient” data.
SJ opaque, EDAI, BCP 2: POR: SJ opaque, EDAI, BCP 231116 - ______ 1: POR: SJ opaque, EDAI, BCP 230829 - 231116 Initial backfill of PORs Nov. 16, 2023, 5:33 p.m. Aug. 16, 2024, 3:18 p.m. 1: Rohit and Jochen make the decision based on “sufficient” data.
SJ opaque, EDAI, BCP 8: POR: SJ opaque, EDAI, BCP 231116 - ______ fast FAI 7: POR: SJ opaque, EDAI, BCP 230829 - 231116 fast FAI Initial backfill of POR Nov. 16, 2023, midnight Aug. 16, 2024, 3:18 p.m. 1: Rohit and Jochen make the decision based on “sufficient” data.
SJ opaque, EDAI, BCP 7: POR: SJ opaque, EDAI, BCP 230829 - 231116 fast FAI Initial backfill of PORs. Aug. 29, 2023, midnight Nov. 16, 2023, midnight 1: Rohit and Jochen make the decision based on “sufficient” data.
SJ opaque, no EDAI, BCP 3: POR: SJ opaque, no EDAI, BCP 230523 - 231116 Initial backfill of PORs. May 23, 2023, midnight Nov. 16, 2023, 8:40 p.m. 1: Rohit and Jochen make the decision based on “sufficient” data.
SJ opaque, no EDAI, BCP 5: POR: SJ opaque, no EDAI, BCP 230523 - 231116 fast FAI Initial backfill of PORs. May 23, 2023, midnight Nov. 16, 2023, 1:52 p.m. 1: Rohit and Jochen make the decision based on “sufficient” data.
SJ opaque, no EDAI, BCP 4: POR: SJ opaque, no EDAI, BCP 231116 - ______ 3: POR: SJ opaque, no EDAI, BCP 230523 - 231116 Initial backfill of PORs. Nov. 16, 2023, 8:40 p.m. Aug. 16, 2024, 3:18 p.m. 1: Rohit and Jochen make the decision based on “sufficient” data.
SJ opaque, no EDAI, BCP 6: POR: SJ opaque, no EDAI, BCP 231116 - ______ fast FAI 5: POR: SJ opaque, no EDAI, BCP 230523 - 231116 fast FAI Initial backfill of PORs. Nov. 16, 2023, 1:52 p.m. Aug. 16, 2024, 3:18 p.m. 1: Rohit and Jochen make the decision based on “sufficient” data.